Surrey’s Two New Unitary Councils: What the 2027 Changes Mean for Your Planning Application
If you are planning an extension, loft conversion or new home in Surrey, the authority that determines your application is about to change. On 1 April 2027, Surrey County Council and the eleven district and borough councils will be dissolved and replaced by two unitary authorities: East Surrey Council and West Surrey Council.
This is the largest structural change to local government in Surrey in fifty years, and planning sits squarely inside it. Here is what homeowners actually need to know – what changes, what does not, and how to think about timing.
What is changing, and when
The government confirmed the two-unitary model for Surrey in October 2025. The confirmed sequence:
• 7 May 2026 – elections held for the two new councils, with results declared the following day. 162 councillors were elected across the two areas.
• May 2026 to March 2027 – the elected members sit as shadow authorities, setting the first unitary budgets and overseeing the legal transfer of services. The West Surrey Shadow Authority held its first meeting in Guildford in May 2026. Existing county, district and borough councillors remain in post throughout.
• 31 March 2027 – the twelve existing councils are dissolved.
• 1 April 2027 (vesting day) – East Surrey Council and West Surrey Council assume full responsibility for all local services, planning included.
Until vesting day, nothing changes operationally. Your application is still validated, consulted on and determined by your existing borough or district council.
Which council will determine your application
The split follows existing borough boundaries, so it is straightforward to work out where you land:
• West Surrey Council will cover the areas of Guildford, Runnymede, Spelthorne, Surrey Heath, Waverley and Woking.
• East Surrey Council will cover the areas of Elmbridge, Epsom and Ewell, Mole Valley, Reigate and Banstead, and Tandridge.
For most of the towns and villages we work in, that means West Surrey: Woking, Guildford, Camberley, Bagshot, Chertsey, Addlestone, Ottershaw, Virginia Water, West Byfleet, Chobham, Windlesham, Brookwood, Pirbright, Worplesdon, Send, Ripley, Shalford and Farncombe.
Cobham sits in Elmbridge and will therefore fall under East Surrey Council – worth noting if you own property on both sides of that boundary.
Three areas we work in are not affected at all
A common point of confusion, and one worth stating plainly because it affects who you contact:
• Ascot, Sunningdale and Sunninghill are in Berkshire, not Surrey. They are administered by the Royal Borough of Windsor and Maidenhead, which is already a unitary authority and is unaffected by Surrey’s reorganisation. If that is your area, see our guide to planning permission in Ascot, Sunninghill and Sunningdale and our pages for Ascot and Sunninghill.
• Fleet and Farnborough are in Hampshire, administered by Hart District Council and Rushmoor Borough Council respectively. Also unaffected. See our Fleet and Farnborough pages.
Postcode boundaries do not follow administrative ones, and GU and SL postcodes cross county lines in several places. If you are not certain which authority covers your property, check before you prepare anything – submitting to the wrong council wastes weeks.
What stays exactly the same
Reorganisation changes who administers the planning system in Surrey. It does not change the planning system itself. All of the following are national and are unaffected:
• The Town and Country Planning Act and the General Permitted Development Order – so permitted development rights are unchanged.
• The National Planning Policy Framework and national planning practice guidance.
• Statutory determination periods – eight weeks for householder and minor applications, thirteen for major schemes.
• Building Regulations and the building control approval process, which run separately from planning in any event.
• The appeal system. Appeals continue to go to the Planning Inspectorate, and the twelve-week householder appeal deadline is unchanged. See our post on what happens when a planning application is refused.
• Party wall procedures under the Party Wall etc. Act. See what is a party wall.
Existing planning permissions also remain valid. A permission granted by Woking Borough Council or Guildford Borough Council does not lapse because the authority that issued it has been dissolved; the new council inherits it, along with the conditions attached.
What is likely to change over time
The practical differences will emerge gradually rather than on day one. Based on how reorganisation has worked elsewhere, expect movement in four areas:
1. Local validation requirements
Each borough currently publishes its own list of documents required to validate an application – and those lists differ. West Surrey will eventually consolidate six sets of requirements into one. During the transition, prepare against the requirements published by the authority that will actually determine your application, not against a neighbouring borough’s list.
2. Local plan policy
This is the substantive one. Each borough has its own adopted local plan with its own policies on extensions, design, parking, Green Belt and housing. Those plans do not evaporate on vesting day – adopted plans are inherited and continue to apply to their original geographies until replaced. Over the following years, the new councils will prepare single local plans covering their whole areas, and that process is where policy on residential extensions may genuinely shift.
3. Committees and delegation
Two councils covering the whole county will need new schemes of delegation and new committee structures. Most householder applications are already determined by officers under delegated powers, so day-to-day handling of extensions is unlikely to change much. Larger and more contentious schemes may follow different routes.
4. Systems and case officers
Planning portals, reference numbers and case officer allocations will be consolidated. Periods of system migration in other reorganisations have produced temporary slowdowns in validation. It is sensible to plan for that rather than be surprised by it.
Should you submit before or after April 2027?
Our honest answer: this is not a strong reason to change your timetable in either direction.
Arguments for submitting under the current authorities: the policies, officers and validation requirements are known quantities, and the determination process is running normally. Arguments for waiting are much weaker – there is no indication that the new councils will be more permissive, and any transition period carries the usual administrative risk of a systems migration.
The more useful principle is the one that applied before any of this: applications succeed on the quality of the submission and on how well the design responds to local policy, not on which letterhead the decision notice carries. If your scheme is ready, submit it. If it is not, the extra months are better spent on feasibility work and pre-application advice than on waiting for a new council.
One timing point does matter. If you already hold a planning permission, check its expiry date. Permissions are normally valid for three years from the date granted, and a permission issued in 2024 or 2025 may need implementing – or renewing – during exactly the period when the new authorities are bedding in. Do not leave that to the last month.
How to prepare your project for the transition
Practical steps, in order:
1. Confirm your authority. Identify your current borough or district council, and which of the two new unitaries will cover you from April 2027.
2. Keep your paperwork. Retain decision notices, approved drawings, discharged condition notices and building control certificates. Records migrate between systems, and having your own copies removes the risk.
3. Check your constraints now. Green Belt, conservation area, Article 4 direction, listed status and tree preservation orders are all designations that transfer to the new authority unchanged. If your property is in the Green Belt, our guide to Green Belt house extensions in Surrey explains what that means for your scheme.
4. Get the design right. A feasibility study establishes what is achievable on your plot under current policy. That analysis holds good either side of vesting day.
5. Use pre-application advice while officers are settled. Pre-app feedback is most useful when the officer knows the local plan area well.
6. Submit a complete application. A well-prepared planning application is the best insulation against administrative disruption, because it removes the grounds for a validation query in the first place.
Where this leaves Surrey homeowners
Reorganisation is a significant administrative change and a modest planning change. The policies that determine whether your extension is approved – Green Belt, conservation area, design, amenity, parking – are set nationally and in adopted local plans, and both survive the transition.
What changes is the map of who you deal with. For anyone with a project in the next two years, the sensible response is to know your authority, keep your records, and make sure the scheme itself is strong enough that the administrative context does not matter.
Frequently asked questions
When do Surrey’s new unitary councils take over planning?
On 1 April 2027, known as vesting day. Until then, your existing borough or district council continues to determine applications as normal.
Which council will handle my planning application after April 2027?
West Surrey Council if your property is in the Guildford, Runnymede, Spelthorne, Surrey Heath, Waverley or Woking areas. East Surrey Council if it is in Elmbridge, Epsom and Ewell, Mole Valley, Reigate and Banstead or Tandridge.
Will my existing planning permission still be valid?
Yes. Permissions granted by the current councils remain valid and are inherited by the new authorities, along with any conditions. Check the expiry date on your decision notice, as permissions are normally valid for three years.
Do the planning rules change in 2027?
National planning law, permitted development rights and Building Regulations are unaffected. Adopted local plans are inherited and continue to apply to their original areas until the new councils replace them, which will take several years.
Should I submit my application before the change?
There is no strong policy reason to rush or to wait. Submit when your scheme is properly designed and documented. Applications are decided on their merits, not on which authority receives them.
Does this affect Ascot, Sunningdale or Sunninghill?
No. Those areas are in Berkshire and are administered by the Royal Borough of Windsor and Maidenhead, which is already a unitary authority. Fleet and Farnborough are in Hampshire and are equally unaffected.
Planning a project in Surrey? Talk to us
Habito Designs is a RIBA Chartered Practice registered with the Architects Registration Board, based in Woking and working across Surrey. We submit applications to these authorities every month and we are tracking the transition closely. See our architectural services, our design process, or get in touch to discuss your project. You can also read more about us on our Surrey architects page.